Three masses, 100 kg, 200 kg and 500 kg. are placed at the vertices of an equilateral triangle with sides 10 m. They are rearranged by an agent on the vertices of a bigger triangle of sides 15 m and with the same in-centre. Calculate the work done by the agent.